grass hotel in 2012

the hotel development in 2012, is located right across from klcc twin towers this could be ten minutes walk. It will bear signature raw concrete grc precast panels with geometrical patterns and shapes and plenty of vertical planting. The base houses 250 parking bays of car park an elevator parking system we will design together with korean engineers. The footprint is extremely tight making this an impossible site for a great reception, generator set rooms and refuse chambers all on the same level.