We were delighted with the recent ong siew lecture series held in singapore which took a turn when zlg presented this building. The deeply intriguing conversation went off on an interesting tangent when we talked about sustainability in a way that was different. We always wanted very much to embrace sustainability which meant we could keep the look and feel of a building for a very much longer time, without having to do strange things to it, like destructive building extensions or modifications. this is one of the very latest images of the challenge park skate centre, showing how the most simple elements are used, without too much concern for decoration. the strong geometry of the roof and the slender columns allow for such modifications that would not take the design concept away from it.
Showing posts with label challenge park. Show all posts
Showing posts with label challenge park. Show all posts
climbing centre
the climbing centre facade openings
©2008.zlgdesign
©2008.zlgdesign
As we proceed to add the internal finishes and make good repairs and tidying up the M/E we see the building slowly completing in phases, the ceiling is undergoing review for enhancements of the specifications, and we are also tending to the need to place plants and more external lighting in readiness for operations to come into place. The facade looks incredibly white and bright from the lightweight blockwork [CSR panels] that used for the skin of the climbing hall. Horizontal slots seen from afar are vents mounted flush to the wall, these serve to let fresh air and daylight to come through to the hall, whereas some are for natural ventilation in case the air conditioning system is turned off at off peak hours to save energy.
skatepark entrance now lit up and ready
for nighttime activities
©2008.zlgdesign
for nighttime activities
©2008.zlgdesign
At this time we are seeing the electrification of all the buildings an surrounding landscape, and also installation of the skate bowl and the specialist works. Interior decoration and Fit out works to the offices and administrative rooms are underway, and the final touches to internal building signages commence in the next weeks. The bold articulation of the eaves remain a pronounced feature of the building and th eslender columns amplify the philosophy of keeping everthig minimal and bare.

night view of skatepark: entrance steps
©2008.zlgdesign
©2008.zlgdesign
At night we see the effect of the ceiling floating above the open plan of the skate park. The columns have been designed to be as slender as possible, supporting the lightweight metal roof. Lighting consists of randomly placed fixtures recessed into waterproofed cement boards.

©2008.zlgdesign
roofline view skatepark
roofline view skatepark
PutraJaya's Skate Park has a roof-line ridge design that is made from steel channel, welded connection, painted and mechanically fixed to roof edge. Slender columns support the big roof, with white painted cement board soffits. Much of the entrance is kept very simple with wash aggregate and cement finishes applied to almost all of the visible surfaces including ramps and the steps leading to the elevated arrival point.
©2008.zlgdesign
skatepark entrance view
skatepark entrance view
The ramp leading up to the elevated levels of the skate park looks into an arrival area with high ceilings, with the car park drop off and entrance to the right. Early photos show the planting of trees as part of the larger landscape strategy to reinstate all of the trees removed at the beginning of construction. Sports persons and VIP personnel take the route below this deck through a tunnel leading to the Skate Facility on the opposite side. Beyond this point we see the hills separating this facility from the second building which is the Climbing centre.
©2008.zlgdesign
view of skatepark facility from field
view of skatepark facility from field
The challenge park facilities comprise two buildings of which one is for Skate park, here the view shows the corner of the main building with fully glazed upper storey walls and a slimline roof edge detail. The entire ceiling is made from one material: homogenous white cementitious boards with random light fittings.

view of the entrance of climbing centre
The Climbing Centre facility in PutraJaya has three wall climbing areas, for competition and training. The slate finish on the external and the zinc roof are materials that lend themselves to a rustic finish but yet modern in the way of its execution. Very tall and slender steel columns supporting the entrance canopy has been made as thin as possible to reduce all structure to its element. Stretchmarks Asia will now be looking at the supervision, supply, construction, completion and maintenance of the climbing facilities, inclusive of training and operations. We currently in consultation with Patrick ANDREY of Stretchmarks to determine colour scheme finish and operational issues leading to handover. This facility is located in Precincts 6 and 7 of the Core Island of PutraJaya.
©2008.zlgdesign
site photo of ramp leading up to the skate park
site photo of ramp leading up to the skate park
The Skate Park Centre has a wash aggregate finish contrasted to a finely detailed glass cladding and powder coated steel structure. The ceiling is smoothly finished in cement boards and terminates in a clean edge detail. The concrete ramp, finished in natural cement render will itself be made to look a part of the walkway, folded and rising slowly to reach the elevated floor. The surrounding site will be generously planted with trees, some of which are being grown in a nearby nursery waiting to be moved to the premises. Price escalation in building materials has made it very difficult to maintain quality of execution of this project, we have however managed to keep most of the finishes specified at contract.
@2005.zlgdesign
early study models of the skate park
early study models of the skate park
The Challenge Park Project for PutraJaya consists two sports buildings: one for wall and indoor climbing centre and the other a partly covered skate park. Both buildings are located in close proximity to each other in Putrajaya, they have been scheduled for completion in late 2008. Groundwork and piling are in advanced stages, superstructure for the Skate park is now visibly complete. See more record photographs and discussions on the dedicated site at challengepark.
Subscribe to:
Posts (Atom)