©2008.zlgdesign
skatepark entrance view

The ramp leading up to the elevated levels of the skate park looks into an arrival area with high ceilings, with the car park drop off and entrance to the right. Early photos show the planting of trees as part of the larger landscape strategy to reinstate all of the trees removed at the beginning of construction. Sports persons and VIP personnel take the route below this deck through a tunnel leading to the Skate Facility on the opposite side. Beyond this point we see the hills separating this facility from the second building which is the Climbing centre.